Welcome to Santa Cruz County - 2019 Measure D Resurfacing Project

project locationS

LIVE OAK, CA

image1

MACIEL AV   

REINELT AV   

THOMAS AV   

RODRIGUEZ ST   

DEL MAR CT   

CATALINA DR   

MALIBU DR   

AXFORD RD   

NEWPORT AV   

THOMPSON AV      

BULB AV   

DEE ST   

REY CT    

APTOS, CA

image2

BEACH   DR   

SPRECKELS DR   

BENNETT RD   

HAINLINE RD   

STEPHEN RD

BONNY DOON, CA

image3

Martin Rd

BEN LOMOND, CA

image4

     BROOKSIDE   AV   

LIVE OAK AV   

PINE   ST   

WHITTIER AV   

LOVE CREEK RD   

CENTRAL AV   

SUNNYSIDE   AV   

MAIN ST    

Upcoming work

Week of August 26th

Final Striping, All Areas

Week of September 3rd

Final Striping, All Areas

image5

schedule and info

Additional Information

The County of Santa Cruz Is Planning Work On Your Street

As part of the county’s pavement maintenance program, 

AMERICAN PAVEMENT SYSTEMS and its subcontractors will be performing work that includes resurfacing the existing pavement.


WHAT YOU NEED TO KNOW

TIMING 

Hours of construction will be from 7:00 a.m. to 5:00 p.m. 

Road closures may be from 8:30 a.m. to 4:30 p.m.

-Pavement Repair

-Pavement Resurfacing- Microsurfacing, Asphalt Rubber Chip Seal, Slurry Seal

-New pavement striping and markings

SAFETY

-A flagman and other workers will be directing traffic to ensure the safe passage of residents and for the safety of the workers. Expect some delays and choose alternative routes, if possible. 

-Your street may be closed to through traffic during the resurfacing process. 

-Please drive slowly while traveling through the work area. 

SIGNAGE

- At least 48 hours prior to the work commencing “No Parking” signs will be placed.

-These signs will have specific dates and times that all parking on the street will be restricted.

PARKING, GARBAGE, WATERING LAWNS AND OTHER IMPORTANT ITEMS:

-Any cars parked within the posted “No Parking” areas on the days listed will be towed. 

-Park off the street or in some other convenient area 

-You may park in your driveway, just not on the street between the signs during the hours of construction.

-Do not drive on the surface treatment until streets have been reopened to traffic or directed by the flagger. 

-Garbage pick up will not be affected. Please place your trash bins on top of the curb. 

-Do not water your lawn on the days listed on the “No Parking” sign or the night before the work. 

-Oil used in these surface treatments will stain carpets, floors and other surfaces. Simple dish soap and water will clean the area if caught before the oil has had time to dry. Citrus solvent cleaner will work if oil has dried.

Contractors Onsite

American Pavement Systems, Inc - 209-522-2277

Prime contractor, resurfacing the road via asphalt rubber chip seal, microsurfacing and slurry seal


C.F. Archibald -  650-364-3045 

Performing asphalt repair and concrete work


Chrisp Company - 510-656-2840 

Installing the new striping and markings